Results 1 to 12 of 12

Thread: Charging per linear mtr for external tape

  1. #1
    Member
    Join Date
    Jul 2012
    Posts
    65
    Thanks
    8
    Thanked 8 Times in 5 Posts

    Default Charging per linear mtr for external tape


    Does anyone charge per linear mtr for external tapes or is it included in the m2 price ? I've just finished a 4 bed house and used nearly 6 boxes of flex tape ( labour only ) . My problem is that the m2 is taken out for windows doors etc and have been offered 30 on top of my m2 price which is ridiculous considering the time involved .. Is this the norm for sub contractors everywhere ? It's always been like this but when you get loads more than normal it really hurts the pocket .. How does everyone else price for this if you work for yourself .?. Thanks

  2. #2
    Season ticket holder amestaper's Avatar
    Join Date
    Dec 2008
    Location
    Edinburgh
    Posts
    2,603
    Thanks
    423
    Thanked 281 Times in 226 Posts

    Default

    It is an extra. If i was getting over a fiver a m2 then i would maybe chuck them in with the measure, but seeing as they are clawing back windows, doors etc out of your rate then you are well within your rights to be charging 3 odd a linear metre if you were supplying. Thats over 100 a box multiplied by 6 and I would expect at least half that for labour only. Its probably not the answer you wanted to hear sorry.

    Why dont you just tape the square meterage then ask him to fit them himself for 30 extra to see if he thinks its a fair price?
    Your messages are really important to us
    ...but not important enough to employ a sufficient number of support staff to answer them.

  3. #3
    Getting the hang of this
    Join Date
    May 2012
    Posts
    196
    Thanks
    4
    Thanked 35 Times in 31 Posts

    Default

    6 boxs is a lot for a 4 bedder,sadly the way things are, just be"greatful" for the extra 30....probably came off the price anyway, if the truth was known,with a lot of firms anyway...

  4. #4
    Member
    Join Date
    Jul 2012
    Posts
    65
    Thanks
    8
    Thanked 8 Times in 5 Posts

    Default

    Quote Originally Posted by amestaper View Post
    It is an extra. If i was getting over a fiver a m2 then i would maybe chuck them in with the measure, but seeing as they are clawing back windows, doors etc out of your rate then you are well within your rights to be charging 3 odd a linear metre if you were supplying. Thats over 100 a box multiplied by 6 and I would expect at least half that for labour only. Its probably not the answer you wanted to hear sorry.

    Why dont you just tape the square meterage then ask him to fit them himself for 30 extra to see if he thinks its a fair price?
    I thought that would be the case I wish I had the bollocks to say that to them ! The thing is I have never been out of work with the firm for the last 10 years so don't want to rock the boat but every now and then something like this comes along and it makes me angry ! Like you say what I should do is leave all the externals and then drop back as a extra and charge them 2 days day work on top of meterage .. But i won't

  5. #5
    Member
    Join Date
    Jul 2012
    Posts
    65
    Thanks
    8
    Thanked 8 Times in 5 Posts

    Default

    Quote Originally Posted by forestbhoy View Post
    6 boxs is a lot for a 4 bedder,sadly the way things are, just be"greatful" for the extra 30....probably came off the price anyway, if the truth was known,with a lot of firms anyway...
    This is so true ! Sadly

  6. #6
    VIP TonyM's Avatar
    Join Date
    Jan 2009
    Posts
    1,330
    Thanks
    52
    Thanked 187 Times in 160 Posts

    Default

    Don't let them walk all over you. Grow a pair and tell them you want extra, especially as they have taken out the window openings. You want a minimum of 2 a linear metre. Fuck'em.

  7. #7
    VIP E.K Taper's Avatar
    Join Date
    May 2010
    Location
    East Kilbride, Glasgow
    Posts
    1,385
    Thanks
    386
    Thanked 199 Times in 177 Posts

    Default

    If theres only a window and 1 external bead in each room then I dont charge extra, but I do include the m2 for the windows and door space. 1 guy pulled me once saying "But you're charging me for window space that isnt there! I want money off!"
    "Ok then " Isaid "But I'll need to charge you 2.75 per metre for beads, and that works out more expensive............"
    He's never questioned me since on any other jobs!

  8. #8
    Member
    Join Date
    Jul 2012
    Posts
    65
    Thanks
    8
    Thanked 8 Times in 5 Posts

    Default

    Ended getting an extra 50 on the m2 price but still getting bent over

  9. #9
    VIP E.K Taper's Avatar
    Join Date
    May 2010
    Location
    East Kilbride, Glasgow
    Posts
    1,385
    Thanks
    386
    Thanked 199 Times in 177 Posts

    Default

    Its 50 you'd never have had if you hadn't chinned him, SJ.
    If ya don't ask............

  10. #10
    Newbie
    Join Date
    Sep 2012
    Posts
    1
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default

    Hi. I have question how long could take to do 340m2 tape and joint walls and cealings just for one men?

  11. #11
    VIP TonyM's Avatar
    Join Date
    Jan 2009
    Posts
    1,330
    Thanks
    52
    Thanked 187 Times in 160 Posts

    Default

    Quote Originally Posted by lukas2106 View Post
    Hi. I have question how long could take to do 340m2 tape and joint walls and cealings just for one men?
    How many, because 'one' is singular and 'men' is plural?

  12. #12
    Season Ticket Holder
    Join Date
    Oct 2012
    Posts
    592
    Thanks
    4
    Thanked 74 Times in 64 Posts

    Default

    The way i look at it is there are two ways to measure, SOLID where you measure the windows and doors in usual for new build, and then theres INDUSTRIAL where they take out all the openings.
    If you measure SOLID then everything is included in the meterage rate inc the bead.

    If you measure INDUSTRIAL then all bead is an extra on a linear meterage.


    If you take a window that is 1m sq and your charging 3 p/m you loose 3 if they knock it out but if you charge 1 per linear on the bead you get it back, its swings and roundabouts. Its all ways pissed me of when they knock out the openings when in truth theres more work there than any where else.

    Agree either way up front and stick to it.

  13. The Following User Says Thank You to Dillon For This Useful Post:

    amestaper (13-10-2012)

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Replies: 5
    Last Post: 16-10-2012, 11:27 AM
  2. external render quote - is this fair
    By newclient in forum Plastering and screeding
    Replies: 1
    Last Post: 09-01-2012, 08:16 PM
  3. External corner tape hopper
    By scottishlad2k10 in forum Taping tools and materials
    Replies: 10
    Last Post: 30-01-2011, 10:05 PM
  4. External beads
    By Captain perfect in forum Classifieds
    Replies: 2
    Last Post: 20-08-2010, 02:05 PM