Results 1 to 8 of 8

Thread: 4 bed david Wilson house

  1. #1
    Newbie
    Join Date
    Jul 2015
    Posts
    3
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default 4 bed david Wilson house


    Hi folks

    how
    long should it take to tape and joint a 4 bed new build. House is now fully sheeted.

    thanks

  2. #2
    Newbie
    Join Date
    Jun 2015
    Posts
    25
    Thanks
    0
    Thanked 8 Times in 7 Posts

    Default

    I'm sure some people will say about 3 days, but i would allow 5 days for an average 4 bed, ( approx 150m/2 floor space as a comparison)

  3. #3
    Newbie
    Join Date
    Jul 2015
    Posts
    3
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default

    Quote Originally Posted by rabbyc View Post
    I'm sure some people will say about 3 days, but i would allow 5 days for an average 4 bed, ( approx 150m/2 floor space as a comparison)

    Cheers

    there are 2 houses to be done

  4. #4
    Season Ticket Holder DMC's Avatar
    Join Date
    May 2010
    Location
    SCOTLAND
    Posts
    522
    Thanks
    22
    Thanked 74 Times in 68 Posts

    Default

    Pretty sure David Wilson build a 3 storey 4 bedroom house.

  5. #5
    Newbie
    Join Date
    Jul 2015
    Posts
    3
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default

    Quote Originally Posted by DMC View Post
    Pretty sure David Wilson build a 3 storey 4 bedroom house.
    they do but mines is 2 storey

  6. #6
    Season Ticket Holder
    Join Date
    Jun 2010
    Posts
    521
    Thanks
    80
    Thanked 74 Times in 71 Posts

    Default

    Quote Originally Posted by 2good View Post
    Hi folks

    how
    long should it take to tape and joint a 4 bed new build. House is now fully sheeted.

    thanks
    It really depends on a lot of things,
    Fiba tape/Paper tape r u working urself?
    Machine taper or hand taper?
    Drying time I would give it 2 weeks with paper tape! (Unless that thing called the sun is actually shining bright)

  7. #7
    VIP TonyM's Avatar
    Join Date
    Jan 2009
    Posts
    1,330
    Thanks
    52
    Thanked 187 Times in 160 Posts

    Default

    If the other tapers are doing them in 2 days, the site agent will expect you to do the same. Good luck.

  8. #8
    VIP E.K Taper's Avatar
    Join Date
    May 2010
    Location
    East Kilbride, Glasgow
    Posts
    1,385
    Thanks
    386
    Thanked 199 Times in 177 Posts

    Default

    4 shifts, and a half shift to sand

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. house bashing blues
    By bingo1 in forum Taping, jointing and drywall finishing
    Replies: 2
    Last Post: 24-01-2011, 07:04 PM
  2. house bashing
    By kentish plasterer in forum Plastering and screeding
    Replies: 1
    Last Post: 18-11-2010, 08:11 AM
  3. Kevin bloody Wilson
    By turrican_007 in forum General off topic chat
    Replies: 2
    Last Post: 17-07-2010, 07:14 PM
  4. Contractor demolishes the wrong house
    By admin in forum Trade and industry news
    Replies: 1
    Last Post: 21-07-2009, 09:15 PM
  5. House price falls in 2008.....
    By admin in forum Trade and industry news
    Replies: 1
    Last Post: 08-01-2009, 10:31 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •